Yield Pharma assigns specific person to evaluate the influence on environment before the start of every project. Yield says no to any environment-cost project which breaks the national environment protection orders.
For waste water and hazardous waste, we have been equipped with enough facilities to storage the wastewater and dispose it through legal ways with out pollution.
For alkaline and acidic waste water, we do decrease its PH to 6-9 before letting it out.
For organic waste, we put it together for recycling, transformation and burning.
For waste gas, we deal with it in the ventilation cupboard with some proper ways.
For the waste material, we bury those dissoluble ones and burn those indissoluble ones.
For the glass or some other sharp material, we put it together in specific rubbish cabins.
|